top of page

The second floor includes an updated bathroom with new waterproof LVT flooring, new walk in shower (replaced old tub), and new granite vanity.  On the first floor is a new powder room off the hall between the kitchen and primary bedroom. First floor plumbing has been upgraded for the two new bathrooms (primary and powder room)

IMG_5486.HEIC
IMG_5481.HEIC
IMG_5525.HEIC
IMG_5488.HEIC
IMG_5487.HEIC
IMG_5524.HEIC
IMG_5480.HEIC
bottom of page